Subject:Approve and authorize the Planning and Development, Transportation Division, to apply for the Texas Department of Transportation, 2021 Transportation Alternatives “Call for Projects” (Preliminary Application), for the Paseo Del Norte Share Use Path, in the amount of $5,987,581.60. A County match in the amount of $1,496,895.40 is required and will be met through Transportation Development Credits and/or County funding. The grant period will be determined at a later date, if awarded. (Contract No. 2021-0128)
Background:

On January 15, 2021, the Texas Department of Transportation (TxDOT) announced a statewide Call for Projects for the Transportation Alternatives Set-Aside (TA) program (including available and anticipated future funds) for bicyclist and pedestrian infrastructure. TxDOT’s 2021 TA Call for Projects features a two-step application process.

 

Through TxDOT’s 2021 TA Call for Projects, the department intends to make available approximately $10.5 million in TA funds associated with FY 2021 and FY 2022 appropriations to the department for nonurban areas (population areas of 5,000 or less**). All or some portion of these funds may be awarded as a result of this Call, depending on the actual amount of funding available and the eligible number of TA project nominations received by the department.

 

The proposed project submission is a trail segment identified by the Paso del Norte Health Foundation as part of the county-line to county-line project. Proposed project will construct a 12-foot-wide shared use path (SUP) along TxDOT ROW (Alameda Ave.) and the bank of the EPCWID#1 canals from Canal St (Fabens, TX) to 2nd Street (Tornillo, TX). The proposed SUP will include trail wayfinding signage, two trailheads, and mile markers. Additional signage & crosswalks will be added to cross twenty local streets. This proposed project is part of a larger 68-mile planned cross-county multi-use trail that runs along a historic canal, 31% of which was been constructed & another 12% is currently under design.

Fiscal Impact:

Requested Amount: $5,987,581.60

 

Required Match Amount:$1,496,895.40 (20% of total project cost--to be met through EDC waiver or Transportation Development Credits, in lieu of match, and/or by County funds, in the case full grant match waivers/credits are not granted by TxDOT)

 

Match funds will be needed/utilized in FY22

Total Project Cost: $7,484,477

Recommendation:Approve and authorize the Planning and Development, Transportation Division, to apply for the Texas Department of Transportation, 2021 Transportation Alternatives “Call for Projects” (Preliminary Application), for the Paseo Del Norte Share Use Path, in the amount of $5,987,581.60. A County match in the amount of $1,496,895.40 is required and will be met through Transportation Development Credits and/or County funding. The grant period will be determined at a later date, if awarded. (Contract No. 2021-0128)
Prior Action:None